The Brief

The major refurbishment of Belmont House in the centre of Uxbridge involving the update of a 1980's design to provide a modern and efficient development offering a vastly enhanced visitor and user experience.
This scheme includes removal of the existing facades back to the concrete frame, and the complete demolition of the central core area. These works will accommodate a new entrance and reception area, providing a new main focal point for the building. Major strengthening works to the existing concrete frame will increase the floor area to 124,000 sq ft. These enhancements will result in the building achieving a BREEAM 'Excellent' rating.

The Solution

Contract Value - £30mill
Duration – 18 months

  • Logistically challenging site, solution based on constraints and requirements on site.
  • Waste is being removed via wheelie bins by a compaction vehicle.
  • Wait & loads, along with crane tested skips are also utilised by this project.
  • Advising and reporting for BREEAM & CCS accreditation, with full post completion report.
Belmont House, Uxbridge-03

If you would like to find out more about our service and how we can help your business, please call us on 01202 870833 or email mail@aws.uk.com

Make an Enquiry

We have used Advanced Waste Solutions for a number of years on various projects and can’t fault the service we have been getting. They offer a wide range of skip options/ services and can back up the good on site service with all the paperwok and reports you would expect as part of an overall waste management service. I would happily recommend AWS to other builders/ developers who want good overall service and support from a waste management company.

- Charles Phillpott, Senior Buyer, Persimmon Homes -

LinkedIn
isoqar Certificate No 14728-QMS-001
ISO14001